Early detection of component health risks prevents 300 MWh of lost energy.
While undertaking routine checks of a client’s 200 MW wind farm in the South-Central U.S., Clir identified an increasing main bearing temperature resulting from low grease levels. Working with the owner and O&M provider resulted in:
-
Proactive identification of temperature increase.
-
Reduced degradation and downtime.
-
Prevention of 300 MWh lost energy.