Leveraging Clir Portfolio to correct blade pitch schedule.

While carrying out a recurring analysis, Clir identified two turbines that had incorrect blade pitch schedules. Clir Portfolio enabled effient identification of the error and implementation of the correct blade pitch schedule. This analysis allowed for:

  • Efficient detection of incorrect blade pitch schedule.

  • Identification of significant pitch error of 4.3 degrees.

  • 240 MWh increase in annual energy production.

Download the full case study